VOSS VILLAGE BMW

Search
Skip to content

After the rain subsided the stucco work began

April 21, 2016 vosshoss

13064520_970622242992342_7692013490443670627_o 13047882_970622172992349_3843824134915341380_o (1) 13047829_970622349658998_4048070020105167354_o 13041349_970622206325679_3350738233059486795_o

Post navigation

Previous PostThe framing for the glass has been installed. The crew has been working tirelessly in the wind and rain, but look how BIG this showroom is going to be!Next PostThe crew opened up the temporary wall between the lounge and new showroom..so I peaked in!!

Voss BMW Blog

Proudly powered by WordPress